0
Items : 0
Subtotal :  0.00
View CartCheck Out
Chennai
Chennai
Singapore
Mumbai
Switzerland
+91 44 4091 2000 Mon - Fri 09:00 - 18:30 766/1, TEZ, Sakthi Towers 1, Anna salai, Chennai 600 002.
+6584181583 Mon - Fri 09:00 - 18:30 68 Circular Road, #02-01, 049422, Singapore.
+91 98848 35702 Mon - Fri 09:00 - 18:30 5, Powai Lake Heights, Mumbai 400 072
+41 (0)91 225 81 00 Mon - Fri 09:00 - 18:30 Equvera - ISV Techno SAGL, Via Ligornetto 6A, 6855 Stabio, Switzerland
Ceritified
ISO 9001:2018
The Best
#1 in India
#1 in Europe
#1 in Asian-pacific
Number #1
AUTOMATION SOLUTION PROVIDER
Talk to an Expert
0
Items : 0
Subtotal :  0.00
View CartCheck Out
opcenter-scheduling-promoopcenter-scheduling-promo

Advanced Scheduling

Opcenter Scheduling software creates production schedules based on availability of resources, constraints and materials required by the order.

Category:
Description

Advanced scheduling reduces downtime and cost

Opcenter Scheduling provides an accurate model of the production environment. This helps you increase resource utilization and on-time delivery.

Create order-based multi-constraint scheduling Create order-based schedules. Rank or weigh items to prioritize orders. Sequencing algorithms take into account resource availability and additional constraints the order requires. Schedules can account for different operation run speeds on resources. Apply sequence dependent changeover times based on an operation’s attributes and allow overlaps and slack time between operations.

Model and optimize resource constraints Model advanced resource constraints, such as rules about concurrent rule usage. Advanced inter-operation constraints include limits on the time between operations and how much operation times can be extended. With advanced schedule optimization, you can define additional schedule optimization rules to deal with problems such as minimizing changeover times, preferred sequencing and campaigning.

Model material usage Implement custom rules about how materials are consumed to ensure that sub-assemblies and raw materials are used according to business rules. When allocating materials, the system filters and ranks data to allow quality-related or customer-specific material usage constraints to be included.

Visualize assembly processes Visualize the assembly process from raw materials through to finished goods and sales orders. The material explorer in Opcenter Scheduling shows a graphical view of the material dependencies as well as plots of stock levels over time. See where shortages will occur and choose to keep them as a constraint or ignore them.

View schedules and track order progression Sales offices use viewers to track the progress of orders. Carry out order inquiries against a read-only copy of the published schedule. Management can compare actual times with scheduled completion times to assess performance of the production process. On a shop floor, cell supervisors or machine operators can use the viewer to see up-to-the-minute work to-do lists.