The commissioning process follows the installation of preconfigured components. All components are checked for correct placement, alignment, and installation, and minor defects are corrected directly if necessary. Major defects are documented along with recommendations for corrective action.
Each commissioning includes system leveling, where transmission and reception parameters of the WLAN infrastructure are coordinated. A post-installation survey documents the status of the WLAN network at the time of commissioning.
The result is a leveled and accepted WLAN infrastructure that meets the requirements of the service description. If any deviations in parameters are identified or necessary adjustments are required, these are also documented in detail.
The WLAN commissioning process follows a logical sequence of proven steps, including preparation, on-site technical execution with measuring equipment, evaluation, and post-processing.